Confidential — for the exclusive use of the board of directors
Risk report to the board of directors
Helvetia Métal SA · Industry / precision machining · Period 2026-Q3
Prepared by C. Berger, Head of Risk · on 05.09.2026
1. Executive summary
The register holds 9 risks: 0 critical, 2 high, 7 medium, 0 low. The overall trend, weighted by severity, is rising (calculated against 2026-Q2, on 8 risks present in both periods). 2 risks above the appetite set by the board (net level ≥ 12) — decision required (§4). No mitigation is behind schedule.
Movements vs 2026-Q2 — 1 entered · 1 exited · 3 worsened · 2 improved
- Worsened: R-01 Information system outage (ransomware) (9 → 12) · R-05 Supply disruption (steel, single supplier) (6 → 9) · R-08 Regulatory tightening (emissions) (4 → 6)
- Improved: R-02 FADP non-compliance (HR data) (9 → 6) · R-06 Seasonal cash-flow strain (9 → 6)
- Entered the register: R-09 Occupational accident (production line) (level 8)
- Left the register: R-10 Strike at the logistics carrier (was 6)
Priority risks
- R-01Information system outage (ransomware) · IT (external provider)12 · High
- R-03Customer concentration (38 % of revenue) · Sales management12 · High
- R-05Supply disruption (steel, single supplier) · Procurement9 · Medium
2. Risk map (residual risk)
Impact ↓ · Likelihood →
5 Critical | |||||
|---|---|---|---|---|---|
4 Major | R-04R-09 | R-01R-03 | |||
3 Moderate | R-02R-06R-07R-08 | R-05 | |||
2 Minor | |||||
1 Negligible | |||||
1 > 10 years | 2 5–10 years | 3 3–5 years | 4 1–3 years | 5 ≤ 1 year |
3. Risk register
| Code | Risk | Owner | Gross | Net | Controls |
|---|---|---|---|---|---|
| R-01 | Information system outage (ransomware) Cyber/IT | IT (external provider) | 20 | 12 · High | EDR deployed, partial MFA, daily backups. |
| R-03 | Customer concentration (38 % of revenue) Strategic | Sales management | 15 | 12 · High | Commercial diversification plan under way. |
| R-05 | Supply disruption (steel, single supplier) Third parties | Procurement | 12 | 9 · Medium | Four-week buffer stock. |
| R-04 | Departure of a key person (production manager) HR | HR Director | 12 | 8 · Medium | Documentation of processes under way. |
| R-09 | Occupational accident (production line) Health & safety (OHS) | QHSE / OHS Manager | 12 | 8 · Medium | MSST/CFST directive 6508 in place, PPE, periodic inspections. |
| R-02 | FADP non-compliance (HR data) Compliance | HR | 12 | 6 · Medium | Privacy policy published, register in progress. |
| R-06 | Seasonal cash-flow strain Financial | Finance Director | 12 | 6 · Medium | Confirmed credit line, 13-week forecast. |
| R-07 | Product non-quality / reputational damage Reputation | QHSE Manager | 8 | 6 · Medium | ISO 9001 certification, sampling checks. |
| R-08 | Regulatory tightening (emissions) Operational | QHSE Manager | 6 | 6 · Medium | Regulatory monitoring in place. |
4. Decisions requested from the board
- R-01 — Information system outage (ransomware) (net level 12 ≥ appetite 12). Decision requested on: Test the full restoration of backups ; Segment the OT/IT network.ApprovedRefusedPostponed
- R-03 — Customer concentration (38 % of revenue) (net level 12 ≥ appetite 12). Decision requested on: Convert 3 new accounts above 5 % of revenue.ApprovedRefusedPostponed
5. Action plan tracking
- R-06 Renegotiate supplier payment terms over the Q4 peak · CFO · 15.09.2026Done
- R-01 Test the full restoration of backups · IT · 30.09.2026In progress
- R-02 Finalise the record of processing activities + sign supplier DPAs · HR · 15.10.2026To do
- R-01 Segment the OT/IT network · IT · 31.10.2026To do
- R-05 Qualify a second steel supplier · Procurement · 31.10.2026In progress
- R-09 Audit the machine guards + refresh safety training (SUVA) · QHSE · 15.11.2026In progress
- R-04 Document critical processes and train a back-up · HR Director · 30.11.2026To do
- R-03 Convert 3 new accounts above 5 % of revenue · Sales management · 31.12.2026In progress
- R-08 Audit emissions compliance and cost the upgrade · QHSE · 31.01.2027To do
6. Occupational health and safety (OHS)
Over the period: 2 accident(s) of which 2 with lost time, 1 near miss(es), 1 occupational illness(es), 10 lost day(s). Frequency rate 88.1, severity rate 0.4 (based on 22'700 hours worked).
OHS risks in the register
- R-09Occupational accident (production line) · QHSE / OHS Manager8 · Medium
7. Human capital (HR)
Headcount at end of period: 48 person(s) (45 FTE). Movements over the period: 3 hire(s), 2 departure(s) of which 1 regretted.
- Turnover rate
- 4.2 %
- Share of regretted departures
- 50 %
- Absenteeism rate
- 2.2 %
- Average employment level
- 93.8 %
- Vacancy rate
- 4 %
- Net change in headcount
- +1 people
Indicators calculated from the source data entered (formulas in the appendix of the HR module); the accident rates (frequency / severity) appear in the OHS section.
8. Emerging risks — horizon scanning
2 theme(s) under active watch and 1 added to the register, on the basis of the horizon framework (environmental, societal, technological, geopolitical, economic, regulatory).
- V-05Shortage of skilled labour and demographics · SocietalUnder watch
Linked to R-04 (key person): 4 polymechanics retire by 2029.
- V-10Industrialised cybercrime · TechnologicalAdded to the register
Covered by R-01 (ransomware) — deepfake scenario to be added to the next crisis exercise.
- V-14Strong franc and currency volatility · EconomicUnder watch
Partial currency hedging (60 % of export revenue) — quarterly review with the bank.
Appendix — Assessment scales
Risk level = Likelihood × Impact. Thresholds: 1-4 low · 5-9 medium · 10-14 high · 15-25 critical. Board appetite: 12.
Impact
- 1 — Negligible : Less than CHF 50'000 · no significant operational disruption · no external impact.
- 2 — Minor : CHF 50'000 to 200'000 · disruption of less than 2 days · isolated customer complaint.
- 3 — Moderate : CHF 200'000 to 500'000 · disruption of 2 days to 1 week · complaint from a major customer.
- 4 — Major : CHF 0.5 to 2 million · shutdown of 1 to 2 weeks · regional press coverage · investigation by an authority.
- 5 — Critical : More than CHF 2 million · shutdown of more than 2 weeks · national press · business continuity at stake.
Likelihood
- 1 — Rare : Less than once in 10 years · no known precedent in the industry.
- 2 — Unlikely : Once every 5 to 10 years · precedent known elsewhere in the industry.
- 3 — Possible : Once every 3 to 5 years · has already occurred in a comparable company.
- 4 — Likely : Once every 1 to 3 years · has already occurred in the company.
- 5 — Almost certain : At least once a year · occurrence expected during the financial year.